Submitted by vincent.minkhant on 05 September 2016
Hydropower, Zee Chaung
| Kalay Township, Chin State | |
| Hydropower | |
| The Ministry of Electricity and Energy (MoEE) | |
| Current awaiting repairs following flood damage in June 2015. | |
| 1260 KW | |
| Repairs were expected to cost Ks100m ($83,000) as of August 2016. | |
|
Operation of both turbines had halted by June 2015 due to flooding in the area. Repairs were required for the plant to return to operation, with plans formulated by August 2016. | |
